美文网首页ScalersTalk第八轮《新概念》朗读持续力训练
卖萌的ScalersTalk第四轮新概念朗读持续力训练Day22

卖萌的ScalersTalk第四轮新概念朗读持续力训练Day22

作者: 在卖萌哦 | 来源:发表于2019-06-26 23:25 被阅读0次

    练习材料:

    [Day 1735 2019-06-26]

    Lesson 13-2  The search for oil

    The geologist needs to know what rocks the drill has reached, so every so often a sample is obtained with a coring bit. It cuts a clean cylinder of rock, from which can be seen the strata the drill has been cutting through. Once we get down to the oil, it usually flows to the surface because great pressure, either from gas or water, is pushing it. This pressure must be under control, and we control it by means of the mud which we circulate down the drill pipe. We endeavour to avoid the old, romantic idea of a gusher, which wastes oil and gas. We want it to stay down the hole until we can lead it off in a controlled manner.

    朗读时间:46s/45s

    任务配置: L0+L4

    知识笔记:

    cutting bit 钻头 /

    练习感悟:

    有点绕嘴 读的太少很仓促 之前都是边遛狗边听边跟读 这样能读好几遍 现在天气热了 干啥都没心情 热热热

    相关文章

      网友评论

        本文标题:卖萌的ScalersTalk第四轮新概念朗读持续力训练Day22

        本文链接:https://www.haomeiwen.com/subject/qmyccctx.html