I want to record my kitchen’s renovation. At the very beginning, we drew up a complete design plan, which made sure my sum under control. The process went through in stages. First, we moved all stuff including cabinet, oven and chair to my garage. I decided to knock through from the kitchen in order to make the space more open and brighter. Then we rewired the house to upgrade our light fixture and remodel the plumbing according to the preview design. We took two days to finish this. On third day, we took off the tile on the floor and replace with a hard wood floor. At that time, I was ready to pull the trigger on the installation. I bought a new exhaust hood because the old one cannot comply with my demand. In addition, the old cabinet near the exhaust hood was too small so I replaced with two shelves. In this way, there would be plenty of space for all usual kitchen appliances. The countertop also needed improvement so that I could have more space to cook. We reconfigured our dinner table so that we can get more leeway for a tea table. I also rewrapped the dinner table to make it match the wooden floor. A large cabinet on the wall was tear out and placed refrigerator in it.
网友评论