It's monday and sunny today,I have a little bad mood today. why does the different people have different attitudes towards the work?
following are my main work today.
1.Study on the process capability of recalculating D1367A.
2.Analyzed and confirmed the reasons of unqualified flatness of the D1367.
3.confirmed the grinding tooling after maintenance with the operators(including measured the flatness of the tooling and the products and the parallelism of the products).
4.because the two inspectors asked for leave,in order to meet the products quality monitoring,Wenhao Sun was responsible for the incoming inspection of accessories and confirmation the roughness of the back plate and the painting thickness,while Zhiqiang Yu and XiaoFeng Dai were responsible for the first part inspection of the later process.