-
Master Data Warehousing
1.1 Creation and Maintenance of Material Master (WH Management)
Warehouse Data
Storage Type Data
1.2 Creation and Maintenance of Organizational-/WH-Structure
Plant
Storage Location
Warehouse Number
Storage Type
Storage Type Group
Availability Group
Storage Section
Work Center
Activity
Activity Area
Staging Area
1.3 Creation and Maintenance of Production Supply Areas (PSA)
PSA
PSA Bin
1.4 Creation and Maintenance of Control Cycles
Control Cycle
1.5 Creation and Maintenance of Storage Bins
Storage Bin
Storage Bin Type
PI/PD (IB/OB)
Packaging Material Type
Packing Specification
HU Type -
Warehouse Monitoring
2.1 Central Monitoring and Control
2.2 Storage Bin Management
2.3 Slotting and Rearrangement
2.4 Resource Management -
Warehouse Processes
3.1 Putaway
Putaway of products after external Goods receipt
Putaway of products after goods receipt from production
Putaway into high rack storage (empty bin)
Putaway into small shelf storage (pallet strategy)
Putaway into flow rack (bulk / pallet strategy)
Putaway into bulk area (bulk / pallet strategy)
Putaway with Sample HU
Putaway with Sample HU and repacking process
Putaway to designation bin with exception Code
Putaway of returnable packaging material
Putaway of one-way packaging material
Putaway of returns from production
RF exception code
3.2 Stock Movements (e.g. from or to External Warehouses)
WO/WT generation rule
3.3 Stock Removal/Picking (e.g. for production supply; for outbound delivery incl. Wave Management)
Stock Removal for production supply
Route train (with & without train station)
Removal strategy (SLED / FIFO / LIFO)
RF exception code
Process code for outbound delivery
Stock removal for customer shipping (TM)
Removal strategy (SLED / FIFO / LIFO)
RF exception code
3.4 Repacking (De-/Consolidation)
Planned repacking
Unplanned repacking
3.5 Warehouse-internal Replenishment
Planned Replenishment
Auto replenishment
-
Physical Inventory
4.1 Annual Inventory
4.2 Ad-hoc Stock Correction
4.3 Continuous Inventory
4.4 Cycle Counting -
Inventory Management
5.1 Goods Receipt from Production / Reversal
Goods receipt process between ERP/EWM
5.2 Stock Transfer Posting (IM-EWM; EWM-IM, IM-IM, EWM-EWM) incl. Return from production
5.3 Manual Consumption for Order / Cost Center / Reversal
5.4 Blocking and Scrapping -
Material Staging
6.1 Consumption-based Call-off
RF Kanban(Product&PSA/HU) Request by manual
Min stock request automatically
BOM explosion by manual
6.2 Order-related Call-Off
6.3 Warehouse Order Processing (incl. Wave Management; Return to Warehouse) -
Reporting
7.1 Inventory Management (IM) Reporting for stock figures
7.2 Inventory Management (IM) Reporting for stock movements
7.3 Warehouse Management (EWM) Reporting
网友评论