非筑名铝模科技铝模板设计案例之印度项目REHAB BLDG NO.2
深化图
签字版深化图
沟通细节,铝模板设计深化联系单
HEBEI GIANT METAL TECHNOLOGY CO., LTD Project management form
项目名称
REHAB BLDG.NO.2
日期
2018.12.15
序号
提出图纸问题 Proposed drawing problem
回复 (reply) OUR REPLY IN BLUE
本工程所有墙体、洞口尺寸均以甲方提供的结构电子版蓝图及电子版建筑蓝图为依据。
All the walls and openings of this project are based on the electronic version of the electronic version and the blueprint of the electronic version provided by Party A.
ALL DRAWINGS WILL BE PROVIDED IN AUTOCAD FORMAT.
所有图纸将以AUTOCAD格式提供。
@
是否还有其他可参考图纸(如8/15层的建筑结构图纸等)
Are there any other reference drawings (such as 8/15 floor structure drawings, etc.)
NO OTHER REFERENCE DRAWING IT INCLUDES ARCH & STRUC DWG. 8/15 FLOOR REFUGE PART WILL BE DONE BY CLIENT
1通用问题
请确认门头过梁是否需要现浇,如需现浇门头下挂梁浇筑方案建议二边延伸250mm(如下图一所示)。
Please confirm whether the door lintel needs to be cast-in-place. If it is required to cast the girder under the cast-in-place head, it is recommended to extend 250mm on both sides (as shown in Figure 1 below).
REFER DOOR WINDOW SCHEDULE.
请参阅门窗一览表。
HEIGHT OF OPENINGS IS 2150 WHICH IS BOTTOM OF THE BEAM
SO NO LINTEL REQUIRED.
- ©
开口的高度是2150,是梁的底部
所以没有需要的过梁。
对门洞口处,铝模考虑下挂梁,若上口无梁,则不考虑,下挂宽度同门宽。下挂高度=层高-梁高-洞口高-地面做法。At the entrance of the door, the aluminum mold considers the hanging beam. If there is no beam at the upper end, it is not considered, and the width of the lower hanging is the same as the width of the door. Under-hang height = layer height - beam height - hole height - ground practice.
- REFER ©
- 参考上面的回答
下挂延伸距离墙或梁边净间距小于500时,下挂做通。
When the lower hanging distance of the wall or the edge of the beam is less than 500, the lower hanging is done.
- REFER ©
- 参考上面的回答
2通用问题
请确认这栋楼外围的脚手架是什么形式。
Please confirm what form of scaffolding is outside the building.
TYPE 1
第一种
3通用问题
请确认与结构内墙连接的墙垛是否需要现浇,如需现浇,建议小于等于300mm的墙垛一次现浇?
Please confirm whether the wall sill connected to the inner wall of the structure needs to be cast-in-place. If it needs to be cast-in-place, it is recommended that the wall sill of 300mm or less is cast in one time.
- REFER DOOR WINDOW SCHEDUE & DRAWING
- 参考门窗一览表和图纸
请确认外墙是否需要改成全现浇结构墙?
Please confirm whether the external wall needs to be changed into a fully cast structure wall?
- REFER FLOOR PLAN
- 参考建筑图
- EXTERNAL NON STRUCTURAL WALLS ARE SHOWN.
- 外部非结构墙已经体现
请确认窗下砌体矮墙是否需要现浇?
Please confirm whether the low wall of the masonry under the window needs to be cast in place?
YES REFER FLOOR PLAN & SECTIONS. ONLY NSW(转换层)NO MESONARY WALL
是的,请参阅建筑图。 只有转换层没有砌筑墙
4通用问题
请确认内墙及梁与砌体墙相交处是否需要做压槽(压槽方案如下图一图二所示)?
Please confirm whether the inner wall and the intersection of the beam and the masonry wall need to be grooved (the groove scheme is shown in Figure 1 and Figure 2).
图一 图二 picture 3 picture 4
NO GROOVE NEEDS TO BE PROVIDED
不需要提供贴片
Please confirm again
Picture 3 & picture 4
YES CONFIRMED NO GROOVES
是的,确认没有凹槽。
请确认外墙是否需要设置凹槽?
Please confirm if the outer wall needs to be grooved?
NO
没有。
下挂梁端头与砌体墙相交的竖向压槽是否需要(如下图三示意)?
Is the vertical pressure groove at the end of the lower hanging beam intersecting the masonry wall (as shown in Figure 3 below)?
图三
NO GROOVE NEEDS TO BE PROVIDED
不需要提供凹槽
用问题
外围所有大于等于结构面250MM以上反梁或现浇矮墙铝模板无法加固,为保证施工质量,铝模施工时建议反梁与板底下挂梁错层浇筑施工(注:如下图所示)
All the outer surface of the reverse beam or the cast-in-situ low-wall aluminum formwork with the structural surface greater than or equal to 250mm can not be strengthened. In order to ensure the construction quality, it is recommended to construct the reverse beam and the suspended beam under the bottom of the plate during the construction of the aluminum mold (Note: as shown below)
YES.
是的
飘窗等位置的盖板是否窗底和窗顶飘板都设置成满盖?
Is the cover of the bay window and other positions set to be covered?
楼梯踏步是否需做盖板,请确认?
Do you need to make a cover for the stair step, please confirm.
With cover plate or without? (windows and the stairs separately)
WINDOW AND STAIRS BOTH WITH COVER PLATE
台和台阶都带有盖板。
6通用问题
是否需要预留传递材料的洞口和浇筑混凝土的管道?
Is it necessary to reserve the hole for the transfer material and the concrete for the concrete?
NOT REQUIRED.
不需要。
设备用房等楼板上需要开设的小孔洞,皆总包做木盒定位预埋。水电需预留洞口,皆有水电工现场设置预埋,我司允许水电工在我方模板上开设管线孔位,但必须保证准确性,不允许重复开设,且直径尺寸不应大于25mm。
水电需要搭设的管线需要你自己开孔,
注意:开了孔的模板不可以更换位置.
The pipeline that needs to be installed for water and electricity needs to be trepanning by yourself.
Notice: the template with holes can not be change its' position.
垂直于墙面的水电开口需要自己解决。
The water and electricity openings perpendicular to the wall need to be solved by yourself.
OK
可以
7通用问题
是否需要进行这样的设计,如图中红圈标注的地方。
Is it necessary to carry out such a design, as shown in the red circle in the figure?
REQUIRED.
需要
为施工方便,楼梯底部与梁底相交尖角处建议填平处理(如下图所示)
For the convenience of construction, it is recommended to fill in the corners of the bottom of the stairs and the bottom of the beam (as shown below)
原图 建议修改后图
ACCEPTED 接受
10通用问题
如果墙上有预留的洞,你需要自己处理,如图所示。
If there is a reserved hole on the wall, you need to handle it yourself, as shown in the figure.
ACCEPTED
接受。
12通用问题
楼面中的降板区域≤150CM的需木模施工。(降板太小铝模无法加固容易偏位)
The wooden formwork construction is required for the lowering area of the floor ≤150CM. (The lowering plate is too small for the aluminum mold to be easily biased)
OK
13通用问题
为考虑吊模安装,铝模提供二种现场施工方案,方案一:吊模现场放马凳加定位筋等处理,方案二:通过楼板面打孔,胶管支撑处理(注:方案二施工完后板面会有洞口,要注意防水及填补需项目部后期自行处理),请确认选用那种施工方案;
In order to consider the hanging mold installation, the aluminum mold provides two kinds of on-site construction schemes. The first scheme: the hanging mold on the scene, the horse stool and the positioning ribs, etc., the second scheme: through the floor surface punching, the hose support processing (Note: after the construction of the second project) There should be a hole in the surface of the board. Pay attention to waterproofing and fill it in the later part of the project. Please confirm the construction plan.
是否需要做用角钢进行加固?
Do you need to do reinforcement with angle steel?
The first plan
第一种方案。
15通用问题
请确认外窗是否要做企口?
Please confirm if the outer window is to be grooved?
窗口四周都需要做企口还是只做上和左右?
Do you need to do groove around the window or only for up,left and right?
NO REQUIRED
不需要
节点3 红圈部分 是否需要一次性浇筑出来
Do you need a one-shoot cast in place?
Yes, have to cast.
是的,必须浇筑
节点1 红圈部分能否二次做
The red circle part needs to second pouring by yourself.
Recommended secondary pouring.
ACCEPTED
接受
图中红圈圈出的两根梁是否有连接
Is there a connection between the two beams in the red circle?
Whether the cut surface is as shown?
REVISED SECTION 3-3 ATTACHED
参考节点3-3
建筑图中,红圈圈出部分的尺寸为100,结构图中是200,以哪个为准?
In the architectural picture, the size of the red circle is 100, and the structure is 200. Which one we should refer to?
As per the structure drawing.
以结构图为准。
红圈部分 是否需要一次性浇筑出来
Do you need a one-shoot cast in place?
YES
是的
窗下的砖石矮墙需要一次浇筑吗?
Does the masonry low wall under the window need to be poured at one time?
YES
是的
由于此项目为国外项目,联系单及深化图均采用中英文对照方式提供