it's Friday and sunny today, i woke up about 5:40 this morning.
i made a cup a tea with chrysanthemum afer washing, and i did't have breakfast.
To Dave:
he required us to eveluate the CPK of thickness, flatness and parallelism with D1367A of M68, but now he change his viewpoint and asked us to use any formula to finish this work A.S.A.P. but i already placed the testing production order to production department, so i should cancel this order, and use M35 formula to do this study, i think we will finish this work before next Wednesday.
and also i asked him how many part numbers, formulas and quantity for this project, he said: "currently all the efforts are focus on the D1367A, and there are more possible part numbers for this project".
To Roy
Pengfei Ma said he did the bulk density was out standard, so i asked Elizabeth sent a deviation with the history data to Roy.
Roy said this standard was temporary, he need more data to check the trend and then confirm the standard of bulk density for M68. so i asked Pengfei to put back on production, but he need to measure the bulk density 5 times for each batch and then feedback to Elizabeth, Elizabeth summary these data and then sent them to Roy.
Morning meeting:
To Rain:
1, Rain should asked maintenance guy and IQC to confirm the status of the tooling and gringding equipment;
2, Rain should asked Peter to arrange the cable and wire for the computer tabel in the LAB;
To Neal:
1, i asked him to update the daily report;
2, he should confirm the payment status for the rotor of Krauss testing equipment, after a short while he sent a email to me and said that the finicial guy alreay pay the expense to the supplier.
To Angel:
she should collect the PSA check list;
To Elizabeth:
i asked her sent the GB5763-2018 to Jenny.
Quality Issue:
Rain told me that there ware some pads of M40 formula had the foreign material quality issue, the ratio is not too high, i asked Elizabeth to the production site to check which material mixed not very well.